This is the latest version of this Act.
Economic Community of West African States
Supplementary Act A/SA.4/01/08 Adopting the Emergency Power Supply Security Plan (EPSSP)
Act 1-4 of 2008
- Published in official journal 52 on 1 January 2008
- Commenced on 18 January 2008
- [This is the version of this document at 18 January 2008.]
Article 1
The following WAPP Emergency Power Supply Security Plan (EPSSP) is hereby adopted.WAPP Emergency Power Supply Security Plan (EPSSP) Action Plan| Provisional cost estimate for power plants | ||
| Item description | 150 MW | 400 MW |
|---|---|---|
| Combustion turbine | $29 m | $77 m |
| Steam generator | $ 15 m | $40 m |
| Steam turbine | $ 15 m | $41 m |
| Feedwater | $ 13 m | $ 35 m |
| Cooling water | $ 5 m | $ 14 m |
| Electricals | $ 10 m | $ 26 m |
| Instr & control | $ 4 m | $ 12 m |
| Buildings etc. | $ 5 m | $14 m |
| Site improvements | $ 5 m | $ 13 m |
| Other off-site costs | $ 7 m | $ 18m |
| Total | $ 108 m | $290 m |
| Benefits from Recommended Best Local Alternatives | |||||
|---|---|---|---|---|---|
| Member States | Energy shortfall assumed (GWh/Yr) | Unit Cost of Production($ / kWh) | Savings/Unit($ / kWh) | Total annual savings ($m/year) | |
| Most efficient present Ops possible | Recommended best local alternative | From best local alternatives | |||
| Gambia | 384 | 0.158 | 0.117 | 0.041 | 15.8 |
| Guinea | 486 | 0.158 | 0.117 | 0.041 | 20.0 |
| Guinea Bissau | 127 | 0.158 | 0.117 | 0.041 | 5.2 |
| Liberia | 370 | 0.158 | 0.117 | 0.041 | 15.2 |
| Sierra Leone | 417 | 0.158 | 0.117 | 0.041 | 17.2 |
| Benin | 237 | 0.158 | 0.068 | 0.049 | 21.3 |
| Burkina Faso | 477 | 0.174 | 0.084 | 0.049 | 43.0 |
| Ghana | 2.642 | 0.158 | 0.064 | 0.053 | 249.5 |
| Mali | 412 | 0.189 | 0.084 | 0.065 | 43.5 |
| Senegal | 573 | 0.158 | 0.084 | 0.033 | 42.7 |
| Togo | 153 | 0.158 | 0.064 | 0.053 | 14.4 |
Article 2
WAPP Emergency Power Supply Security Plan (EPSSP) referred to Article 1 of this Supplementary Act shall be implemented by the West African Power Pool (EPSSP).Article 3
Article 4
ECOWAS Member States shall take all necessary measures to ensure the effective implementation of the emergency plan as adopted by this Supplementary Act.Article 5
This Supplementary Act shall be published by the Commission in the Official Journal of the Community within thirty (30) days of its signature by the Authority. It shall also be published in the National Gazette of each Member State within the same time.Article 6
Article 7
This Supplementary Act shall be deposited with the Commission which shall transmit certified true copies thereof to all Member States and register it with the African Union, the United Nations and any other organisation as Council may determine.History of this document
18 January 2008 this version
Commenced